TC Fluid Engineering
TC Fluid Engineering
Company
News
Markets
Industries
Case Studies
Products
Services
Contact Us
TC Fluid Engineering

Case Studies - Argent Energy Steam and Condensate Upgrade

Argent Energy (UK) Ltd operates the UK’s first large scale biodiesel plant.

After 18 months of operation the initial steam and condensate system was showing signs of wear and tear, breakdowns occurred on a regular basis affecting production.

TC Fluid Engineering Ltd. was approached to offer a solution.

After a number of customer/client meetings a new scheme was proposed.

The savings became immediately apparent.

This success has led to new projects now being engineered in partnership with TC Fluid Engineering Ltd.